THE SAVANNAH BUILDING KITS

KIT #1
This kit contains all materials necessary to build the fuselage, the wings with flaperons and slats, the tail with rudder, elevator trim with servo and attached wiring harness, wing struts with drop shaped fairings already drilled for perfect adjustment, tricycle landing gear, wheel with separate pedal activated disc brakes, tyres, inner tubes, pedals, yoke, flaps lever, commands, cables with turnbuckles, guides and mounting brackets, all cables already cut to the right length and closed at the ends with thimbles and certified nicopress equipment.

All the parts are produced by serial production on CNC and laser-cutting machines to obtain a dramatic cut in the expenses and to get a final result of superior quality, with perfect interchangeability of the spare parts, with no need for further fittings.

Therefore, all the alluminium skins are cut to size, bended or pressed, drilled and ready to be riveted using the included rivets. Just a little deburring of the holes could be necessary. To obtain a perfect result, even the rivet gun is included in the kit, together with some tack welds and their pliers. For a quick and perfect building it is suggested to use about 1500 tack welds (clecos) that could be bought separately. We can buy back these tack welds for the same price at the end of the work, anyway within 6 moths.

The parts that need to be nailed (wing spars, some parts of the fuselage, etc.) are supplied ready-made in order to simplify the buiding.

Included in the kit are as well::

To complete the airplane you would need:
engine mount / engine cowlings / engine / propeller / water and oil radiators, tubes, hoses, fittings, straps, seat paddings / instruments / electrical wiring / paint / cockpit upholstery.

ESTIMATED BUILDING TIME (without painting and upholstery work) 100 hours + engine & implants installation
KIT #2
As for KIT #1, plus::

To complete te airplane you would need:
Rotax 912 engine with oil tank, con serbatoio olio, current rectifier, exhaust and propeller

ESTIMATED BUILDING TIME (without painting and upholstery work) 250 hours
KIT #3
As for  KIT #2, plus Rotax 912 engine, voltage regulator, oil tank, exhaust with stainless steel silencer, propeller and spinner

ESTIMATED BUILDING TIME (without painting and upholstery work) 250 hours

KIT #4
As for KIT #3 but with competed wings, fuselage, tail, etc. and adjusted ailerons and rudders

You just have to do the painting, inside upholstery, engine, instruments and implants work

ESTIMATED BUILDING TIME (without painting and upholstery work) 110 hours


Other accessories are optionals. Request the complete aircraft brochure